Bay Bridge Pump Station Project Q & A

Home >> Construction >> Bay Bridge Pump Station Project Q & A

Here you will find answers to general questions about the future Bay Bridge Pump Station and Force Mains Replacement Project in the City of Newport Beach.

What are pump stations?

Pump stations are an integral part of the sewer system. Sewer pipelines carry wastewater flow from residences, businesses, manufacturers, etc. The sewer collection system is a gravity fed system, much like the gutters in front of our homes. Since not all of Orange County slopes toward OC San facilities for treatment, we need pump stations. Pump stations are constructed when there are no alternatives to getting flows from low points to high points. After pipes get to a low elevation, pump stations are needed to “lift” or pump the wastewater to a higher elevation to continue to flow by gravity or pressure to the local treatment plan, in this case, to OC San’s Plant No. 2 facility in Huntington Beach.

OC San has a total of 15 off-site pump stations. Did you know that eight of them are in Newport Beach? A Street, 15th Street, Lido, Bay Bridge, Rocky Point, Bitter Point, Crystal Cove, and MacArthur Pump Stations. With the exception of the MacArthur Pump Station, all are located along the coast.

What are force mains?

Force mains are pressurized sewer pipelines. Pump stations pump the wastewater that is pressurized, or forced, through pipes because gravity alone is not enough to move it.

This project will replace the dual force mains which are two side-by-side sewer pipelines across the lower Newport Bay Channel.

What happens if the project does not happen?

Treating wastewater is necessary for the overall care of the environment. If wastewater is not safely collected and transported, there could be negative impacts to public health and the environment. Both the pump station and force mains are nearing the end of useful life. There is an increased risk of sewage spills directly into the channel that would be harmful to the surrounding environment.

What are some benefits to this project?

The project is necessary to protect public health and the environment. With that, there are many benefits that come with the project. Since we live, work, and play so close to the water, it’s important to protect it. The scenic and recreational values of living along the bay are reasons why people choose to live where they do. Properly collecting and treating wastewater keeps our waters clean, so we can continue to safely live, work, and play in the Newport Bay.

There is no debate odors are often associated with wastewater. This project adds an odor control scrubber system to help reduce odorous compounds from incoming wastewater into the pump station to prevent odors to the surrounding community.

Building a new pump station will not only enhance the aesthetics with the building architecture, but also enhance the reliability and efficiency of wastewater management.

Why can’t the original pump station be demolished first and the next one built in its place?

The Bay Bridge Pump Station is critical to ensure wastewater continuously flows to its final destination for treatment. Wastewater treatment is required 24/7. Demolishing the original pump station first would leave this area without the ability to transport the wastewater to the treatment plant in Huntington Beach. This would mean the millions of gallons of wastewater that flow through the pump station daily could not be pumped out of the area. The new pump station will need to be constructed while the original pump station is in service. After construction of the new pump station is completed and operational, the original pump station can be taken out of serivce and demolished.

How much wastewater flows through the Bay Bridge Pump Station?

The average daily flow through the pump station is 4 million gallons a day (mgd), with a normal peak flow of 8 mgd. During wet weather events, the Bay Bridge Pump Station receives upwards of approximately 18 mgd! This means the pumps need to be sized appropriately in order to handle and prevent overflows during normal flows and wet weather events.

4 mgd is equivalent to 6 Olympic-sized swimming pools of water passing through the pump station every given day.

What will the pump station look like?

Architectural rendering of the Bay Bridge Pump Station.

Most of the pump station will be underground including the pumps, motors, other mechanical equipment, and wastewater piping. The above ground building will house electrical equipment, instrumentation, and control equipment in order to meet current code requirements.

There will also be a second structure to house a back-up power generator and odor control facility. The generator will allow the pump station to run at full capacity should power go down (planned or unexpected) to ensure there are no interruptions to service. An odor control scrubber system will remove odorous compounds from the incoming wastewater flows to prevent odors.

The architecture of the building will comply with design guidelines from the City of Newport Beach and will be coordinated to match and blend in with the future property development surroundings.

The image shown above is a design rendering. The layout and facility design are subject to change.

What is the current status of the project?

The project is currently in the final design phase. Construction is anticipated to start in 2025 and take approximately 4.5 years to complete.

Read additional information about what to expect during construction here.

Stay In The Know

Community Liaison:
(714) 378-2965

Email:
constructionhotline@ocsan.gov

Sign up for text alerts:
click here

Related Construction