The Taft Avenue Sewer Improvement Project is a future project slated to replace and relocate a portion of the Taft Sewer in the City of Orange.
The project will upsize almost two miles of pipe along Taft Avenue from Glassell Street to Sacramento Street, northbound on Sacramento Street to Brentford Avenue, to Breckenridge Street to Meats Avenue. The current pipe ranges between 12 to 15 inches and will be upsized to 18 to 21 inches.
A portion of the sewer that currently runs along Tustin Street will be relocated to N. Sacramento Street where there is more room to install a larger pipe and facilitates the future maintenance of the pipeline.
Â
Current Status:
The project is currently in design. Construction is anticipated to start in summer 2024 and conclude in spring 2026.